Planned
Binder Production Start
highManufacturing
Mass production of all binder types begins (9-slot, 4-slot, Mini, and Toploader). Each passes quality control before packaging.
External Quality Control
lowManufacturing
Quality control (external agency - not related to our main supplier) to ensure the best quality for the first production run.
Card Base Production
mediumManufacturing
Production of the metal base for graded card CNC milling -> polishing process -> deep laser engraving -> sandblasting -> anodizing -> QC -> packing.
Ai Tracking Card Production
mediumManufacturing
Production of the Find My Card.
Accessory Production Start
mediumManufacturing
All additional accessories — magnetic name tags, aluminum stands, sleeves, and toploaders — go into production.
Customer Fulfillment
highshipping
Shipment to all customers
TELEC Certification (Japan)
mediumCompliance
TELEC certification for Japan market compatibility of BLE module. Required for future distribution in Japan.
In Development
Kickstarter Final Report
criticalAdministration
Waiting for Kickstarter’s final backer report (approx. 2 weeks after campaign end). This allows us to prepare the customer surveys and finalize all order data.
Packaging Design
criticalDesign
Design packaging for each binder type (9-slot, 4-slot, toploader, mini, graded card). Packaging color matches binder color; texture and vegan leather surface are visible and touchable through the box window.
Kickstarter Funds
criticalFinance
Kickstarter transfers all campaign funds after the mandatory 14-day processing period. Funds will be allocated directly to supplier payments and logistics setup.
FCC, CE, and RoHS Certification
mediumCompliance
Compliance testing for electronic components and materials. Ensures full adherence to EU and US standards. Tags: certification, compliance
Japan Retail Distribution Setup
lowSales & Expansion
Collaboration with our Japanese distributor to bring Cardsupply products to local TCG shops and department stores in Tokyo, Osaka, and Nagoya.
Completed
API v2.0
mediumPackaging Design (Accessories)
Packaging design for all accessories including the graded card base.
Magnetic Name Tag Engraving Setup
lowFulfillment
Define final engraving templates (Cardsupply logo front, blank backside). Prepare guidelines for custom engraving options in Shopify.
Raw Material Procurement
highProduction
All raw materials — microfiber leather, PP pages, zippers, metal parts, and packaging materials — are now being ordered and secured for full-scale production
Container & Rail Logistics Setup
highLogistics
Shipment will take place via rail freight from China to Germany. Transit time: approx. 4 weeks. (Already secured and negotiated)
Mold Development & Tooling
mediumEngineering
Tooling and mold optimization for metal parts, packaging elements, and injection parts are being finalized to ensure maximum precision and consistency.
Disclaimer
While we strive to deliver all products on time and according to the estimated schedule, production and shipping timelines may be subject to change due to factors beyond our control — including raw material availability, global logistics delays, or customs clearance.
We are committed to keeping our backers and customers informed and will communicate any updates transparently and promptly.
All product descriptions, images, and specifications are for reference only and may be subject to minor adjustments to ensure the best possible quality.
Trademark Notice
Apple, the Apple logo, and Find My are trademarks of Apple Inc., registered in the U.S. and other countries.
Google and the Google logo are trademarks of Google LLC.
All other product names, logos, and brands are property of their respective owners.
Use of these names, trademarks, and brands does not imply endorsement.



